Hyundai excavator FOB price
This page explains how used Hyundai excavator pricing works FOB Shanghai, and how to get a CIF landed figure.
Why buy used hyundai excavator fob price from ExcaYard
ExcaYard sources pre-owned Caterpillar, Komatsu, Hitachi, Volvo, Doosan, Hyundai, Kobelco, Sany, XCMG, SDLG, LiuGong and Sunward excavators from China's verified yard network, and ships worldwide. Every machine passes a 150-point pre-shipment inspection; FOB Shanghai with a CIF quote within 24 hours. We handle SONCAP (Nigeria), SABER (Saudi Arabia), PVoC (Kenya/Tanzania/Ghana), GSA and KEBS. Payment by T/T, L/C or Wise; shipping by RoRo, container or flat-rack; ports Shanghai, Ningbo, Qingdao and Tianjin; typical CIF lead time 28-45 days port-to-port.
What our 150-point inspection covers
Every machine we export undergoes a 150-point pre-shipment inspection covering engine, hydraulics, undercarriage, electrical systems and structural components. We verify working hours and use paint-thickness checks to detect prior repairs or repainting, and you receive a full report with photos and video before shipment.
Export documents and certifications
We prepare the commercial invoice, packing list, bill of lading and certificate of origin, and arrange destination-specific conformity certification such as SONCAP, SABER, PVoC, GSA or KEBS where required, so your machine clears customs without surprises.
| Factor | Details |
|---|---|
| Inspection | 150-point pre-shipment inspection (included) |
| Shipping | RoRo / container / flat-rack; FOB Shanghai or CIF |
| Payment | T/T USD wire, L/C through Bank of China, Wise |
| Certification | SONCAP / SABER / PVoC / GSA / KEBS as required |
| Lead time | Typically 28-45 days port-to-port (CIF) |
Frequently asked questions
What is the FOB price of a used Hyundai excavator?
FOB price depends on model, year, hours and condition. ExcaYard quotes per machine after the 150-point inspection; CIF on request within 24h.
Does the FOB price include shipping?
No — FOB means loaded at a Chinese port. Ocean freight and insurance are extra; ask for a CIF quote if you want them included.
Is the price negotiable?
There is usually some room depending on quantity and payment terms (full T/T or confirmed L/C).


