Used Excavators for Sale in Egypt
New Administrative Capital construction, Suez Canal Economic Zone, and infrastructure renewal driving strong demand.
- Alexandria
- Port Said
- Damietta
30-35 days FOB Shanghai → Alexandria
GOEIC inspection required. ACID/CARGOX advance notification. Letter of Credit common.
Market Overview
Egypt is in a major infrastructure renewal cycle: the New Administrative Capital outside Cairo, the Suez Canal Economic Zone development, the Grand Egyptian Museum complex, and a national highway expansion. All create sustained demand for used excavators in the 20-35 ton class.
GOEIC (General Organization for Export & Import Control) inspection is mandatory for used machinery. The ACID (Advance Cargo Information Declaration) system requires 48-hour advance notification before vessel arrival. We coordinate this.
Letter of Credit (LC at sight) is the more common payment method for Egypt imports than TT, due to currency controls. We accept both. Customs clearance at Alexandria is typically 10-20 days.
Top brands for Egypt
Recommended for Egypt
Based on demand patterns in the North Africa region.
2020 305E2 CR
2019 336
2018 308E2 CR
2021 320 GC
2015 323D
2018 320D
Frequently Asked Questions — Egypt
Why is LC payment preferred for Egypt? +
Egyptian central bank currency controls make LC the more reliable payment instrument. Importers find it easier to allocate USD via LC than direct TT.
Get a CIF quote to Egypt
24-hour response. Specify your destination port and we will calculate landed cost.
Запросить цену