Excavadoras usadas to Egypt
EGP forex shortage. USD-via-Dubai corridor for payment.
What's moving this market.
Motores macro shape which weight class and brand mix actually moves volume. Read this before locking inventory.
- ▸ New Capital project
- ▸ Suez SEZ
- ▸ Renewables
- Arancel
- 5–10% + 14% VAT
- Límite de antigüedad
- Restricted
- Moneda
- EGP / USD (constrained)
- Pago
- USD via Dubai corridor
How a deal to Egypt actually runs.
- 01 GOEIC
- 02 CoC
GOEIC inspection required. ACID/CARGOX advance notification. Letter de Credit common.
Why Egypt imports the way it does.
Egypt is in a major infrastructure renewal cycle: the New Administrative Capital outside Cairo, the Suez Canal Economic Zone development, the Grand Egyptian Museum complex, and a national highway expansion. Todo create sustained demand for excavadoras usadas in the 20-35 tonelada class.
GOEIC (General Organization for Exportación & Import Control) inspection is mandatory for used machinery. The ACID (Advance Cargo Information Declaration) system requires 48-hour advance notification before vessel arrival. We coordinate this.
Letter de Credit (LC at sight) is the more common payment method for Egypt imports than TT, due to currency controls. We accept both. Customs clearance at Alexandria is typically 10-20 days.
Stock matched to Egypt demand.
Yard máquinas aligned with the 20–40 t-class demand pattern in North Africa. Todo inspected, CIF-quotable in 24h.
2010 DH225LC7
2010 SK210LC8
2019 PC2008M0
2012 SY75C
2024 XE27U
2020 3055E2
CIF quote to Egypt in 24 hours.
Enviar your spec (year, hours, class, attachments) and discharge port. We return the country-specific compliance package and total landed cost the next business day.