ExcaYard.
Kobelco medium / #EXY-KOBESK210LC8-225 / Grade C

2011 Kobelco SK210LC8

Refurbishment buyer · specific items disclosed. Sourced from 洛阳市, China. 14 current photos available; walkaround video and extra angles can be recorded on inquiry.

Live walkaround video on request — we record yard-side via WhatsApp in 24 h
Documentation included with this unit
  • Commercial Invoice (CI)
  • Packing List (PL)
  • Bill of Lading (B/L) — original copies on payment
  • Certificate of Origin (CCPIT)
  • Current photo set + extra angles on request
  • Pre-shipment photos (hour meter, serial plate, ECM screenshot)
  • Marine insurance certificate (Institute Cargo Clauses A)
  • OEM service manual (if available with source unit)
  • Market-specific certificate (SONCAP / SABER / PVoC / GSA — per destination)
Inspector verdict
30-second read

Refurbishment buyer — clear pathway to working condition.

Age 15 yrs · 2011
Use 800 h/yr avg
Profile Moderate operator — typical service profile
57 / 100
overall score
Grade C
condition class
ENG 65
HYD 68
UC 40
COS 55
Verified spec sheet
from inspection · 2011
Year
2011
Operating hours
12,000 h
Operating weight
21 t
Bucket capacity
1.05 m³
Engine
Source yard
洛阳市, CN
Technical specifications
OEM published for Kobelco SK210LC8

Full OEM specifications.

Below are manufacturer-published nominal specifications. Actual measured values for this unit are in the inspection report. We verify all critical values against the machine on inspection.

Engine
Power
118 kW / 158 hp
Displacement
5.2 L
Emissions
Tier 3 / Stage IIIA
Model
Hydraulic system
Main pump flow
426 L/min
Relief pressure
34.3 MPa
Hydraulic tank
230 L
Fuel tank
400 L
Performance
Max dig depth
6.71 m
Max dig reach
9.87 m
Bucket force
140 kN
Stick force
98 kN
Dimensions
L × W × H
9.5 × 2.8 × 2.93 m
Track shoe
600 mm
Track gauge
2.39 m
Ground pressure
47 kPa
Travel & swing
Travel speed (high)
5.5 km/h
Travel speed (low)
3.4 km/h
Gradeability
35°
Swing speed
12.3 rpm
Condition assessment
from 150-point inspection

Grade C.
Disclosed honestly.

We grade by measured fact, not by hope. The bars show our inspector's estimate of remaining service life per major system. Detailed wear photos and OEM-tool readouts are in the inspection report.

Previous owners
1
Owner type
contractor
Engine
Compression %, oil sample, ECM history, exhaust profile
65% remaining
Hydraulics
Cycle times vs OEM spec, drift test, cylinder rod condition
68% remaining
Undercarriage
Chain pitch stretch, sprocket wear, idler / roller condition
40% remaining
Cosmetic + cabin
Paint, glass, seat, gauges, AC operation
55% remaining
Service & maintenance history
timeline · indicative

What this machine
went through.

The timeline below traces this unit’s known service events. Where source-yard records are incomplete, we reconstruct typical service intervals based on hour count — and disclose this transparently.

  1. 2012-Q2 service @ 3,000 h

    First major service interval — engine oil, hydraulic filter, fuel filter replacement.

  2. 2013-Q3 service @ 6,000 h

    Mid-life service — coolant flush, final drive oil, swing gear lubrication.

  3. 2014-Q4 service @ 9,000 h

    Routine service — air filter, fuel filter, cabin filter, hydraulic oil sample analysis.

  4. 2026-Q2 inspection @ 12,000 h

    ExcaYard 150-point pre-export inspection — engine compression, hydraulic cycle test, undercarriage measurement, ECM data extraction.

Inspection record
Inspection scope
150 points
measured, not visually estimated
OEM diagnostic
OEM tool
ECM data extracted
Photo evidence
14 photos now
per component, in PDF
3rd-party verifiable
SGS · BV · Intertek
re-inspection welcomed

The inspection note is shared on inquiry. Major findings, visible wear, current photo set, and any requested extra angles are reviewed before payment.

What is in your CIF quote
no hidden surcharges

Every line item,
named.

Some exporters quote low CIF then add discovery fees, doc fees, handling fees, lashing surcharges. Our CIF is the total — only port-side destination charges (controlled by your local broker, not us) are extra.

Cost component In CIF Notes
EXW yard priceYesMachine purchase
Inland trucking to portYesYard → Shanghai / Tianjin / Qingdao
Container loading / RoRo handlingYesLashing, surveyor fees
Ocean freightYesCOSCO / MSC / Höegh
Marine insurance ICC(A)YesPICC / Ping An · 0.4–0.6%
Certificate of origin (CCPIT)YesEnglish default
Inspection note + photo setYesPre-shipment
Market PSI (SONCAP / SABER / PVoC / GSA)YesWhere regulation requires
Destination port handlingNoBuyer's broker
Import duty + VATNoPer local customs
Inland trucking to siteNoLocal logistics
After-order timeline
what happens after your deposit

From deposit
to delivery — visible.

Cross-border purchases fail when customers don’t know what’s happening. Our standard timeline below tells you the exact sequence — and what you can verify at each step.

  1. Day 0

    Deposit received

    30% TT deposit clears in 1–2 banking days. Machine is reserved against your name. We send written confirmation + final pre-shipment task list.

  2. Day 1–5

    Re-inspection + buyer review

    Final pre-shipment check. Buyer may engage SGS / BV / Intertek for third-party PSI at this stage. Buyer receives the current photo set and any requested extra angles or walkaround video.

  3. Day 5–10

    Documentation + market certificate

    Commercial Invoice, Packing List, Certificate of Origin (CCPIT), market PSI certificate (SONCAP/SABER/PVoC/GSA) issued. Documents shared with buyer for review before shipment.

  4. Day 7–12

    70% balance + B/L issuance

    Buyer pays remaining 70% TT (or LC at sight presents documents). On payment clearance, original Bill of Lading is couriered to buyer's nominated address.

  5. Day 10–14

    Container loading / RoRo dispatch

    Machine loaded at Shanghai / Tianjin / Qingdao. Pre-departure photos shared. Vessel sails. Buyer receives sailing notice with ETA.

  6. Day 14–X

    Ocean transit

    Transit varies by port: 8–12 d Vladivostok, 12–15 d Manila, 22–25 d Jebel Ali, 28–32 d Lagos, 35–40 d Callao. Live vessel tracking link provided.

  7. Day X+1–7

    Destination clearance

    Buyer's local customs broker clears the shipment. We supply any additional documentation requested by destination customs.

  8. Day X+30

    Warranty period ends

    30-day mechanical warranty against pre-existing defects from arrival date. After this, lifetime spare parts support continues at our list price.

After-sales support

We don’t
disappear
after the B/L.

01 · Warranty
30 days mechanical

Covers pre-existing defects discovered after arrival. Inspection report is the reference document for claims.

02 · Spare parts
Lifetime sourcing

We source genuine, OEM, or quality aftermarket parts at our cost + 8% margin. No mandatory dealer markup.

03 · Remote diagnostic
WhatsApp video

If your operator hits an issue, we connect live via WhatsApp video and walk through diagnosis with our master mechanic team.

04 · Documentation
OEM manuals

Service manual, operator manual, parts catalog PDFs supplied where available — useful for your own mechanics anywhere in the world.

Optional add-on · 01

Spare parts package

Engine oil + filter set, hydraulic filter set, fuel filter set, air filter set, cabin filter, common O-ring kit, bucket pin/bushing spare pair, 6-month routine consumables.

Add to order from
$480
Add to inquiry →
Optional add-on · 02

Operator training

45-minute walkthrough video covering controls, daily checks, common operator errors, and basic maintenance. Subtitled English / Russian / Spanish / Arabic / French / Portuguese. Remote-only at this time.

Included
Free
Request video →
01

Overview

This Kobelco SK210LC8, year 2011, with 12,000 hours, is located in our Luoyang yard. As a Grade C unit, it shows clear signs of operational wear and requires moderate mechanical attention. The 21.0-ton machine is powered by its original OEM engine, which runs but may need servicing. Offered as-is for buyers seeking a lower-cost entry into the 20-ton class with full disclosure of its condition.

02

Specifications highlights

Original Kobelco OEM engine and hydraulic system. Standard 0.9 m³ bucket included. Operating weight 21.0 tons. Undercarriage has 70% remaining life on tracks and rollers. Swing mechanism and final drives are functional with minor leaks. Cabin has basic instrumentation and air conditioning (needs recharge). Boom and arm show surface rust and minor weld repairs.

03

Working condition

Grade C: Fair condition with visible wear. Engine starts and operates but has oil seepage and may require a top-end overhaul. Hydraulic pump pressure is slightly below spec; hoses show cracking. Bucket has worn edges and teeth. Undercarriage is usable but sprockets and idlers are worn. Structural welds on boom foot are sound. No major cracks. Paint is faded with rust patches. Full inspection report available.

04

Why choose this unit

The Kobelco SK210LC8 is a common model in Africa and Southeast Asia, with good parts availability and service support. Its 21-ton class is versatile for general excavation and construction. Choosing this Grade C unit means lower upfront cost, ideal for buyers with in-house maintenance capabilities. Kobelco's reputation for fuel efficiency and durability remains even on older units. Spare parts are widely available through aftermarket channels.

05

Best for

General earthmoving, trenching, and material handling in mining or construction. Suitable for buyers in Nigeria, Kenya, Indonesia, or Vietnam who have access to local mechanics and parts suppliers. Best for operations where high uptime is not critical and cost reduction is prioritized.

06

Shipping & documentation

FOB Shanghai. Can be loaded in a 40ft flat rack (disassembled) or via RoRo vessel. Estimated freight to Mombasa: $3,500–$4,500; to Lagos: $4,000–$5,000; to Jakarta: $2,500–$3,500. Port loading and lashing included. Shipping documents provided within 3 days of payment.

Frequently asked

About this unit.

Are hours verified?

Hours are from the meter reading. We do not guarantee accuracy but note they are consistent with machine wear.

Payment terms?

30% deposit via T/T, 70% balance before shipment. L/C accepted for established buyers.

Parts availability?

Kobelco SK210LC8 parts are widely available from OEM and aftermarket suppliers globally. We can assist sourcing if needed.

FOB Shanghai
$12,000
WhatsApp Inquire →