ExcaYard.
Kobelco large / #EXY-KOBESK260LC8-122 / Grade B

2015 Kobelco SK260LC8

Mechanically sound · cosmetic wear disclosed. Sourced from 北京市, China. 18 current photos available; walkaround video and extra angles can be recorded on inquiry.

Live walkaround video on request — we record yard-side via WhatsApp in 24 h
Documentation included with this unit
  • Commercial Invoice (CI)
  • Packing List (PL)
  • Bill of Lading (B/L) — original copies on payment
  • Certificate of Origin (CCPIT)
  • Current photo set + extra angles on request
  • Pre-shipment photos (hour meter, serial plate, ECM screenshot)
  • Marine insurance certificate (Institute Cargo Clauses A)
  • OEM service manual (if available with source unit)
  • Market-specific certificate (SONCAP / SABER / PVoC / GSA — per destination)
Inspector verdict
30-second read

Mechanically strong with disclosed wear — best value bracket.

Age 11 yrs · 2015
Use 382 h/yr avg
Profile Light operator — well below industry average
72 / 100
overall score
Grade B
condition class
ENG 80
HYD 82
UC 55
COS 70
Verified spec sheet
from inspection · 2015
Year
2015
Operating hours
4,200 h
Operating weight
26 t
Bucket capacity
1.3 m³
Engine
Source yard
北京市, CN
Technical specifications

Full OEM parameters verified at inquiry.

We do not list specifications we have not personally cross-checked against the Kobelco SK260LC8 OEM brochure for this exact variant. On your inquiry, we send the complete spec sheet (engine power / hydraulic flow / dimensions / dig reach / travel speed / fuel consumption) along with the 150-point inspection report.

Request full OEM spec sheet →
No registration. PDF sent by email + WhatsApp within 24 h. We do not invent numbers.
Condition assessment
from 150-point inspection

Grade B.
Disclosed honestly.

We grade by measured fact, not by hope. The bars show our inspector's estimate of remaining service life per major system. Detailed wear photos and OEM-tool readouts are in the inspection report.

Previous owners
1
Owner type
contractor
Engine
Compression %, oil sample, ECM history, exhaust profile
80% remaining
Hydraulics
Cycle times vs OEM spec, drift test, cylinder rod condition
82% remaining
Undercarriage
Chain pitch stretch, sprocket wear, idler / roller condition
55% remaining
Cosmetic + cabin
Paint, glass, seat, gauges, AC operation
70% remaining
Service & maintenance history
timeline · indicative

What this machine
went through.

The timeline below traces this unit’s known service events. Where source-yard records are incomplete, we reconstruct typical service intervals based on hour count — and disclose this transparently.

  1. 2016-Q2 service @ 1,050 h

    First major service interval — engine oil, hydraulic filter, fuel filter replacement.

  2. 2017-Q3 service @ 2,100 h

    Mid-life service — coolant flush, final drive oil, swing gear lubrication.

  3. 2018-Q4 service @ 3,150 h

    Routine service — air filter, fuel filter, cabin filter, hydraulic oil sample analysis.

  4. 2026-Q2 inspection @ 4,200 h

    ExcaYard 150-point pre-export inspection — engine compression, hydraulic cycle test, undercarriage measurement, ECM data extraction.

Inspection record
Inspection scope
150 points
measured, not visually estimated
OEM diagnostic
OEM tool
ECM data extracted
Photo evidence
18 photos now
per component, in PDF
3rd-party verifiable
SGS · BV · Intertek
re-inspection welcomed

The inspection note is shared on inquiry. Major findings, visible wear, current photo set, and any requested extra angles are reviewed before payment.

What is in your CIF quote
no hidden surcharges

Every line item,
named.

Some exporters quote low CIF then add discovery fees, doc fees, handling fees, lashing surcharges. Our CIF is the total — only port-side destination charges (controlled by your local broker, not us) are extra.

Cost component In CIF Notes
EXW yard priceYesMachine purchase
Inland trucking to portYesYard → Shanghai / Tianjin / Qingdao
Container loading / RoRo handlingYesLashing, surveyor fees
Ocean freightYesCOSCO / MSC / Höegh
Marine insurance ICC(A)YesPICC / Ping An · 0.4–0.6%
Certificate of origin (CCPIT)YesEnglish default
Inspection note + photo setYesPre-shipment
Market PSI (SONCAP / SABER / PVoC / GSA)YesWhere regulation requires
Destination port handlingNoBuyer's broker
Import duty + VATNoPer local customs
Inland trucking to siteNoLocal logistics
After-order timeline
what happens after your deposit

From deposit
to delivery — visible.

Cross-border purchases fail when customers don’t know what’s happening. Our standard timeline below tells you the exact sequence — and what you can verify at each step.

  1. Day 0

    Deposit received

    30% TT deposit clears in 1–2 banking days. Machine is reserved against your name. We send written confirmation + final pre-shipment task list.

  2. Day 1–5

    Re-inspection + buyer review

    Final pre-shipment check. Buyer may engage SGS / BV / Intertek for third-party PSI at this stage. Buyer receives the current photo set and any requested extra angles or walkaround video.

  3. Day 5–10

    Documentation + market certificate

    Commercial Invoice, Packing List, Certificate of Origin (CCPIT), market PSI certificate (SONCAP/SABER/PVoC/GSA) issued. Documents shared with buyer for review before shipment.

  4. Day 7–12

    70% balance + B/L issuance

    Buyer pays remaining 70% TT (or LC at sight presents documents). On payment clearance, original Bill of Lading is couriered to buyer's nominated address.

  5. Day 10–14

    Container loading / RoRo dispatch

    Machine loaded at Shanghai / Tianjin / Qingdao. Pre-departure photos shared. Vessel sails. Buyer receives sailing notice with ETA.

  6. Day 14–X

    Ocean transit

    Transit varies by port: 8–12 d Vladivostok, 12–15 d Manila, 22–25 d Jebel Ali, 28–32 d Lagos, 35–40 d Callao. Live vessel tracking link provided.

  7. Day X+1–7

    Destination clearance

    Buyer's local customs broker clears the shipment. We supply any additional documentation requested by destination customs.

  8. Day X+30

    Warranty period ends

    30-day mechanical warranty against pre-existing defects from arrival date. After this, lifetime spare parts support continues at our list price.

After-sales support

We don’t
disappear
after the B/L.

01 · Warranty
30 days mechanical

Covers pre-existing defects discovered after arrival. Inspection report is the reference document for claims.

02 · Spare parts
Lifetime sourcing

We source genuine, OEM, or quality aftermarket parts at our cost + 8% margin. No mandatory dealer markup.

03 · Remote diagnostic
WhatsApp video

If your operator hits an issue, we connect live via WhatsApp video and walk through diagnosis with our master mechanic team.

04 · Documentation
OEM manuals

Service manual, operator manual, parts catalog PDFs supplied where available — useful for your own mechanics anywhere in the world.

Optional add-on · 01

Spare parts package

Engine oil + filter set, hydraulic filter set, fuel filter set, air filter set, cabin filter, common O-ring kit, bucket pin/bushing spare pair, 6-month routine consumables.

Add to order from
$760
Add to inquiry →
Optional add-on · 02

Operator training

45-minute walkthrough video covering controls, daily checks, common operator errors, and basic maintenance. Subtitled English / Russian / Spanish / Arabic / French / Portuguese. Remote-only at this time.

Included
Free
Request video →
01

Overview

This 2015 Kobelco SK260LC8 excavator, with 4,200 hours, is sourced from our yard in Beijing, China. It is a Grade B unit, meaning it shows signs of operational wear but remains fully functional. The machine has been serviced and is ready for export. The SK260LC8 is a reliable 26-ton class excavator known for its durability and fuel efficiency.

02

Specifications highlights

Equipped with the original OEM engine, this excavator offers 26.0 tons of operating weight, providing stability and digging power. The standard bucket is included, and the hydraulic system operates smoothly. Key components such as the swing motor, travel motor, and main control valve are in good working condition. The undercarriage shows moderate wear consistent with the hours.

03

Working condition

Grade B: The machine has been inspected and is in fair condition. There is visible wear on the bucket teeth, track pads, and some hoses. The cab interior shows usage but all controls function properly. No major leaks or structural issues. The engine starts reliably and runs without abnormal noise. We recommend replacing wear parts soon for optimal performance.

04

Why choose this unit

The Kobelco SK260LC8 is a popular choice for export due to its robust design and easy maintenance. It offers a good balance of power and fuel economy, making it suitable for various applications. Kobelco parts are widely available in Africa, SE Asia, and the Middle East, reducing downtime. This model's long track and wide undercarriage provide excellent stability in soft ground conditions.

05

Best for

Ideal for general construction, road building, and quarry work. Suitable for medium to large-scale projects requiring trenching, loading, and material handling. Particularly well-suited for markets in Africa (e.g., Nigeria, Kenya), Southeast Asia (e.g., Indonesia, Philippines), and the Middle East (e.g., Saudi Arabia, UAE) where parts and service support are established.

06

Shipping & documentation

FOB Shanghai port. This excavator can be shipped in a 40ft flat rack container (with boom and arm removed) or via RoRo vessel. Typical transit time: 25-30 days to East Africa, 18-22 days to Southeast Asia. We handle all loading and securement. Shipping cost estimate available upon request.

Frequently asked

About this unit.

Are hours verified?

Hours are taken from the meter reading at time of inspection. We cannot guarantee they are original, but we check for signs of tampering.

Payment terms?

We require 30% deposit via T/T, 70% balance before shipment. L/C at sight is possible for established buyers.

Parts availability?

Kobelco parts are widely available globally. We can also supply common wear parts upon request.

FOB Shanghai
$19,000
WhatsApp Inquire →